[1]
2025. A Study of the Factors Affecting Real-Time Completion of Construction Projects in Al-Haraba City, Libya. Comprehensive Journal of Science. 10, 38 (Dec. 2025), 2664–2672. DOI:https://doi.org/10.65405/d4hb6s44.